Select a transformer
Technical check list
Drawings
Installed Power (PI)
Check all your circuit charges
Machines (Motors) :
kW
Illumination (Internal and External) :
kW
Electrical Pile machines alimentation :
kW
Sockets (Internal and External) :
kW
Heating Equipments (showers, ovens, stoves, electrical water tap, etc.) :
kW
Air Conditioners :
kW
Installed Power :
kW
Demand Factor (FD)
Check bellow typic values of demand factor. We still recommend to consult the local power utility and the analysis of the specific Demand Factor for each load:
Type here the request factor from your installation :
Power Factor (FP)
The minimum value required is 0.92
Type here the Power Factor from your circuit :
0.85
0.86
0.87
0.88
0.89
0.90
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
Increasing Load Prevision (PAC)
We recommend the utilization of 20% of increasing load prevision at least
Type here the Increasing Load Prevision :
20
25
30
35
40
%
Homologated Rated Power without PAC
Dimensioning relation
PT =
PI x FD
FP
kVA
Calculated Rated Power
kVA
WEG Line
Homologated Rated Power
Homologated Rated Power
Dimensioning relation
PT =
PI x FD x PAC
FP
kVA
Calculated Rated Power
kVA
WEG Line
Homologated Rated Power